Leader of Change 5

It looks like the controlling period of the proposed change is actually the uphill task of all the change implemenation process. Relatively, monitoring of the control progress seems tough due to the incoming data in parts from the various site of the operation.



Some of the results shows that the change was implemented and shows positve impact but at the other hand there are few locations still under familiarisation mood of the change due to the fear of under estimate of the works quantity. This makes the proposed repair works designer have the mind set of so sceptical of the volume or size of defect measured during the site assessment carried out before the design. Thus, turn the designer to provide extra provisional size of defects to avoid uncovered defects during the site assessment.